Close Menu
    Trending
    • UAE GDP projected to rise 5 percent according to World Bank
    • STS Digital Named Digital Asset Provider of the Year by FOW
    • Developing Asia-Pacific economy set to grow 5% in 2026
    • OMP and PwC Alliance Moves Process Manufacturers from Siloed Supply Chain Planning to Unified Decisions
    • Abdullah bin Zayed joins Trump talks with regional leaders
    • Egypt remittance inflows reach $29.7 billion by July 2026
    • Typhoon Dujuan hits eastern Japan with heavy rain
    • China holds 3% one-year LPR and 3.5% mortgage benchmark
    • Home
    • Contact Us
    Cambodian DailyCambodian Daily
    Monday, September 28
    • Automotive
    • Business
    • Entertainment
    • Health
    • Luxury
    • Lifestyle
    • News
    • Sports
    • Technology
    • Travel
    Cambodian DailyCambodian Daily
    Home » GA-ASI Completes Full-Scale Fatigue Test on MQ-9B
    ACCESS Newswire

    GA-ASI Completes Full-Scale Fatigue Test on MQ-9B

    November 17, 2025
    Facebook WhatsApp Twitter Pinterest LinkedIn Telegram Tumblr Email Reddit VKontakte

    MQ-9B’s Third Lifetime Test Completes the FSF Testing Process With a Total of 120,000 Hours

    DUBAI, UAE / ACCESS Newswire / November 16, 2025 / On October 31, 2025, General Atomics Aeronautical Systems, Inc. (GA-ASI) completed its “third lifetime” of full-scale fatigue (FSF) testing for the MQ-9B Remotely Piloted Aircraft (RPA). Completion of FSF testing for the third and final lifetime includes a total of 120,000 operating hours (40,000+ flight hours per aircraft life) for the RPA and is a key milestone in validating the design of the airframe. The testing verifies the airframe structural integrity in support of certification to the NATO STANAG 4671 standard.

    The aim of the testing is to identify any potential structural deficiencies ahead of fleet usage and assist in developing inspection and maintenance schedules for the airframe. Test results will be used as documentation for certification and will form the basis for in-service inspections of structural components.

    “The completion of our full-scale fatigue test validates years of GA-ASI design and analysis efforts,” said GA-ASI President David R. Alexander. “The first two lifetimes simulated the operation of the aircraft under normal conditions, and the third intentionally inflicted damage to the airframe’s critical components to demonstrate its ability to tolerate operational damage that could occur over the lifetime of the aircraft.”

    Testing was conducted from December 13, 2022, through October 31, 2025, at Wichita State University’s National Institute for Aviation Research in Wichita, Kansas. The airframe tested was a production airframe purpose-built to support the test campaign.

    MQ-9B is GA-ASI’s most advanced RPA and includes the SkyGuardian® and SeaGuardian® models as well as the new Protector RG Mk1 that is currently being delivered to the United Kingdom’s Royal Air Force (RAF). In addition to the RAF, GA-ASI has MQ-9B procurement contracts with Belgium, Canada, Japan, Taiwan, Poland, India, Denmark, and the U.S. Air Force in support of the Special Operations Command. MQ-9B has also been featured in various U.S. Navy exercises, including Northern Edge, Integrated Battle Problem, RIMPAC, and Group Sail.

    About GA-ASI

    General Atomics Aeronautical Systems, Inc., is the world’s foremost builder of Unmanned Aircraft Systems (UAS). Logging more than 9 million flight hours, the Predator® line of UAS has flown for over 30 years and includes MQ-9A Reaper®, MQ-1C Gray Eagle®, MQ-20 Avenger®, and MQ-9B SkyGuardian®/SeaGuardian®. The company is dedicated to providing long-endurance, multi-mission solutions that deliver persistent situational awareness and rapid strike.

    For more information, visit www.ga-asi.com.

    Avenger, EagleEye, Gray Eagle, Lynx, Predator, Reaper, SeaGuardian, and SkyGuardian are trademarks of General Atomics Aeronautical Systems, Inc., registered in the United States and/or other countries.

    # # #

    Contact Information

    GA-ASI Media Relations
    asi-mediarelations@ga-asi.com
    (858) 524-8101

    SOURCE: General Atomics Aeronautical Systems, Inc.

    Related Images

    View the original press release on ACCESS Newswire

    Related Posts

    OMP and PwC Alliance Moves Process Manufacturers from Siloed Supply Chain Planning to Unified Decisions

    September 23, 2026

    Bayer to Present How it Rebuilt Global Planning with OMP at Gartner Supply Chain Planning Summit 2026

    September 17, 2026

    ABO Capital Launches Africa 7, a Seven-Marathon Campaign Across Seven African Countries in Seven Days

    September 17, 2026

    GA-ASI Mojave First UAS To Complete Battlefield Short Field Ops

    September 17, 2026

    AGFA HealthCare Puts Clinical Attention at the Center of Enterprise Imaging at RSNA 2026

    September 14, 2026

    GA-ASI Unveils Wildfire UAS for Military, Civil and Commercial Roles

    September 10, 2026
    Latest News

    UAE GDP projected to rise 5 percent according to World Bank

    September 26, 2026

    Developing Asia-Pacific economy set to grow 5% in 2026

    September 24, 2026

    Abdullah bin Zayed joins Trump talks with regional leaders

    September 23, 2026

    Egypt remittance inflows reach $29.7 billion by July 2026

    September 22, 2026
    © 2026 Cambodian Daily | All Rights Reserved
    • Home
    • Contact Us

    Type above and press Enter to search. Press Esc to cancel.