Close Menu
    Trending
    • Amazon wildfires in Brazil fall to lowest level in four decades
    • Private sector wage growth hits six year low in latest UK data
    • GA-ASI and MBDA Commit to Weapons Collaboration
    • GA-ASI Completes Qualification Testing for UK Protector Weapons
    • Indonesia begins building $20.9 billion Masela LNG project
    • UN urges fair rules for artificial intelligence worldwide
    • DR Congo Ebola outbreak reaches 2,267 cases and 893 deaths
    • IOM launches $98 million appeal for Venezuela quake recovery
    • Home
    • Contact Us
    Cambodian DailyCambodian Daily
    Thursday, July 23
    • Automotive
    • Business
    • Entertainment
    • Health
    • Luxury
    • Lifestyle
    • News
    • Sports
    • Technology
    • Travel
    Cambodian DailyCambodian Daily
    Home » GA-ASI Completes Full-Scale Fatigue Test on MQ-9B
    ACCESS Newswire

    GA-ASI Completes Full-Scale Fatigue Test on MQ-9B

    November 17, 2025
    Facebook WhatsApp Twitter Pinterest LinkedIn Telegram Tumblr Email Reddit VKontakte

    MQ-9B’s Third Lifetime Test Completes the FSF Testing Process With a Total of 120,000 Hours

    DUBAI, UAE / ACCESS Newswire / November 16, 2025 / On October 31, 2025, General Atomics Aeronautical Systems, Inc. (GA-ASI) completed its “third lifetime” of full-scale fatigue (FSF) testing for the MQ-9B Remotely Piloted Aircraft (RPA). Completion of FSF testing for the third and final lifetime includes a total of 120,000 operating hours (40,000+ flight hours per aircraft life) for the RPA and is a key milestone in validating the design of the airframe. The testing verifies the airframe structural integrity in support of certification to the NATO STANAG 4671 standard.

    The aim of the testing is to identify any potential structural deficiencies ahead of fleet usage and assist in developing inspection and maintenance schedules for the airframe. Test results will be used as documentation for certification and will form the basis for in-service inspections of structural components.

    “The completion of our full-scale fatigue test validates years of GA-ASI design and analysis efforts,” said GA-ASI President David R. Alexander. “The first two lifetimes simulated the operation of the aircraft under normal conditions, and the third intentionally inflicted damage to the airframe’s critical components to demonstrate its ability to tolerate operational damage that could occur over the lifetime of the aircraft.”

    Testing was conducted from December 13, 2022, through October 31, 2025, at Wichita State University’s National Institute for Aviation Research in Wichita, Kansas. The airframe tested was a production airframe purpose-built to support the test campaign.

    MQ-9B is GA-ASI’s most advanced RPA and includes the SkyGuardian® and SeaGuardian® models as well as the new Protector RG Mk1 that is currently being delivered to the United Kingdom’s Royal Air Force (RAF). In addition to the RAF, GA-ASI has MQ-9B procurement contracts with Belgium, Canada, Japan, Taiwan, Poland, India, Denmark, and the U.S. Air Force in support of the Special Operations Command. MQ-9B has also been featured in various U.S. Navy exercises, including Northern Edge, Integrated Battle Problem, RIMPAC, and Group Sail.

    About GA-ASI

    General Atomics Aeronautical Systems, Inc., is the world’s foremost builder of Unmanned Aircraft Systems (UAS). Logging more than 9 million flight hours, the Predator® line of UAS has flown for over 30 years and includes MQ-9A Reaper®, MQ-1C Gray Eagle®, MQ-20 Avenger®, and MQ-9B SkyGuardian®/SeaGuardian®. The company is dedicated to providing long-endurance, multi-mission solutions that deliver persistent situational awareness and rapid strike.

    For more information, visit www.ga-asi.com.

    Avenger, EagleEye, Gray Eagle, Lynx, Predator, Reaper, SeaGuardian, and SkyGuardian are trademarks of General Atomics Aeronautical Systems, Inc., registered in the United States and/or other countries.

    # # #

    Contact Information

    GA-ASI Media Relations
    asi-mediarelations@ga-asi.com
    (858) 524-8101

    SOURCE: General Atomics Aeronautical Systems, Inc.

    Related Images

    View the original press release on ACCESS Newswire

    Related Posts

    GA-ASI and MBDA Commit to Weapons Collaboration

    July 21, 2026

    GA-ASI Completes Qualification Testing for UK Protector Weapons

    July 20, 2026

    Multi-Billion-Dollar Global Sports Brand U.S. Polo Assn. Earns Global Awards and Recognitions Across Business, Sport, and Content Categories

    June 30, 2026

    Pacific Avenue Capital Partners Announces Investment Committee Appointment, New AI Initiative, and Team Expansion

    June 26, 2026

    U.S. Polo Assn. Unveils Spring-Summer 2027 Collection at the 110th Edition of Pitti Immagine Uomo

    June 18, 2026

    U.S. Polo Assn. Palm Beaches Marathon Celebrates America’s 250th, Adds $17,000 in Prize Money as it Returns December 12-13, 2026

    June 11, 2026
    Latest News

    Amazon wildfires in Brazil fall to lowest level in four decades

    July 23, 2026

    Private sector wage growth hits six year low in latest UK data

    July 22, 2026

    Indonesia begins building $20.9 billion Masela LNG project

    July 18, 2026

    UN urges fair rules for artificial intelligence worldwide

    July 18, 2026
    © 2026 Cambodian Daily | All Rights Reserved
    • Home
    • Contact Us

    Type above and press Enter to search. Press Esc to cancel.